Bathroom remodel estimate template

A bathroom remodel estimate needs to separate demo, rough-in, finishes and fixtures, because those are the parts customers change their minds about. Breaking it out also shows where a permit and a plumber fit in.

Free for 14 days. No credit card needed to start.

Sample estimate

For Jordan W., Columbus OH

Estimate

What the customer asked for

“Gut and remodel a 5x8 hall bath: new tub with tile surround, 30 inch vanity, toilet, LVP floor, paint.”

  • Demo to studs, haul away (12 hrs + dumpster)$1,290
  • Plumbing rough-in and set fixtures (sub)$1,800
  • Alcove tub and valve$650
  • Cement board, waterproofing, tile 80 sq ft$760
  • Tile surround install (20 hrs)$1,400
  • 30 in vanity, top, faucet$620
  • Toilet$260
  • LVP floor 44 sq ft incl. waste$190
  • Install vanity, toilet, floor, trim (12 hrs)$840
  • Patch, prime and paint (8 hrs + paint)$520
  • Plumbing permit$150
Total with 25% margin$10,600
Illustrative US average pricing. Your rates, market and materials will change the numbers.

What to include

Demo and disposal
Name the dumpster or haul-away cost; it surprises customers when it is missing.
Who does the plumbing
If a licensed plumber is a sub, show it as its own line.
Waterproofing
Listing the membrane shows you are not cutting the corner that causes leaks.
Fixture allowances
Give a dollar allowance for vanity and tile so upgrades become a change order, not a fight.
Permit
Most full remodels that move or replace plumbing need one.
Hidden conditions
Rotted subfloor or joists get priced once you open the wall.

Pricing notes

  • Small full bathroom remodels often land between $10,000 and $25,000 depending on finishes and market.
  • Tile labor is the swing item; price it per square foot or by hours, not as a guess.
  • A 20 to 25% margin is common on remodels because hidden conditions are likely.

Priced for your area

Common questions

How long does a 5x8 bathroom remodel take?

Usually two to three weeks of working days, longer if tile has to cure between steps or the inspection waits.

Should I include fixtures or let the customer buy them?

Including them lets you control lead times and earn margin. If the customer supplies them, say so and note that you are not responsible for defects.

How do I handle rot found during demo?

Write it into the estimate as an exclusion, then send a change order with the repair price once you have opened the wall.

Price your next bathroom remodel job in a minute

Describe it in plain English. Skaffold fills in the line items, hours and margin, and you edit before it goes out.

Start your free trial

Free for 14 days. No credit card needed to start.